Advantages of a new ballastless trackform

Autor: C. Keseljevic, T. Sedran, I. Robertson, F. Barresi, C. Masson, J.M. Vanzenberg, J. Caillau
Přispěvatelé: Alstom Transport (Alstom Transport), Matériaux pour Infrastructure de Transport (IFSTTAR/MAST/MIT), Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)-PRES Université Nantes Angers Le Mans (UNAM), NBT_2 - New Ballastless Track, Cadic, Ifsttar
Jazyk: angličtina
Rok vydání: 2015
Předmět:
Engineering
ESSAI
0211 other engineering and technologies
02 engineering and technology
Track (rail transport)
CYCLE DE VIE
Laboratory testing
Construction engineering
BALLASTLESS TRACK
Conceptual design
DESIGN
CONCEPTION
021105 building & construction
Very high speed and mixed freight-high speed traffic
SPEED TRAFFIC
Life cycle costs
Forensic engineering
General Materials Science
GRANDE VITESSE
VERY HIGH SPEED AND MIXED FREIGHT-HIGH
MONITORING
TRAIN A GRANDE VITESSE - TGV
ENTRETIEN
021101 geological & geomatics engineering
Civil and Structural Engineering
RESEAU FERROVIAIRE
business.industry
COUT
Building and Construction
SOUS COUCHE FERROVIAIRE
LABORATORY TESTING
[SPI.GCIV]Engineering Sciences [physics]/Civil Engineering
LIFE CYCLE COSTS
MAINTENANCE
[SPI.GCIV] Engineering Sciences [physics]/Civil Engineering
DEMONSTRATION TRACK
PISTE D'ESSAI
SITE EXPERIMENTAL
business
CHEMIN DE FER (VOIE)
CONTROLE
Throwing
TRANSPORT DE MARCHANDISE
Zdroj: Construction and Building Materials
Construction and Building Materials, Elsevier, 2015, 92, pp.16-22. ⟨10.1016/j.conbuildmat.2014.06.099⟩
2th International Railway Engineering Conference and Exhibition
2th International Railway Engineering Conference and Exhibition, Apr 2011, Johannesburg, South Africa. pp.16-22
ISSN: 0950-0618
DOI: 10.1016/j.conbuildmat.2014.06.099⟩
Popis: This paper is based on a development over the past 5 years in France which culminates in early 2013 with the construction of a demonstration of this ballastless trackform on the French network north of Paris. In this paper, we summarise the history of this development, " New Ballastless Track " (NBT) through the conceptual design phases, the extensive laboratory testing, culminating in the construction of the demonstration track. Construction will be completed in June 2013 and train operations are scheduled to start later in 2013. We complete our paper with our conclusions concerning the difference in life cycle costs between NBT and ballasted track. To that end, we confirm the conclusions of many previous studies over the past few years, while throwing some light on the parameters which will tend to accentuate the advantage of NBT.
Databáze: OpenAIRE