Implementation of Lean Manufacturing to Reduce the Delivery Time of a Replacement Part to Dealers: A Case Study

Autor: Hertwin Minor-Popocatl, Prudencio Fidel Pacheco-García, Elias Olivares-Benitez, Marcos Fernando Pérez-Pucheta, Carlos Eleazar Pérez-Pucheta
Jazyk: angličtina
Rok vydání: 2019
Předmět:
0209 industrial biotechnology
Computer science
Process (engineering)
Automotive industry
02 engineering and technology
Lean manufacturing
lcsh:Technology
value stream mapping
lcsh:Chemistry
020901 industrial engineering & automation
0502 economics and business
Added value
General Materials Science
A3 report
Instrumentation
lcsh:QH301-705.5
Fluid Flow and Transfer Processes
business.industry
lcsh:T
Process Chemistry and Technology
05 social sciences
General Engineering
automotive industry
Manufacturing engineering
lcsh:QC1-999
Computer Science Applications
Value stream mapping
lcsh:Biology (General)
lcsh:QD1-999
Order (business)
lcsh:TA1-2040
Spare part
Value (economics)
lean manufacturing
business
lcsh:Engineering (General). Civil engineering (General)
replacement part
050203 business & management
lcsh:Physics
Zdroj: Applied Sciences
Volume 9
Issue 18
Applied Sciences, Vol 9, Iss 18, p 3932 (2019)
ISSN: 2076-3417
DOI: 10.3390/app9183932
Popis: In today&rsquo
s automotive industry, Lean production systems are used successfully to reduce delivery times. The current case study addresses a problem that affects an automotive company, which is the excessive delivery time of a spare part to its both national and international authorized dealers. In order to reduce the delivery time of this replacement part, the Lean Manufacturing methodology was used. For this purpose, the value stream mapping and the proposed A3 report are the tools used. With the use of these tools, activities that did not add any value are eliminated or modified
in addition, the logistical flow of the modules of the door-side trim panel delivery process is improved. As a result, added value is increased, the delivery time is reduced (for Mexico) and the number of product variants is reduced. Now, the painting process is done by the authorized dealers, and the number of pieces used for every spare part was estimated. The study demonstrates that the integration of value stream mapping administrative/productive in conjunction with the A3 report proposal allows to identify and eliminate waste in the delivery process.
Databáze: OpenAIRE