Implementation of Lean Manufacturing to Reduce the Delivery Time of a Replacement Part to Dealers: A Case Study
Autor: | Hertwin Minor-Popocatl, Prudencio Fidel Pacheco-García, Elias Olivares-Benitez, Marcos Fernando Pérez-Pucheta, Carlos Eleazar Pérez-Pucheta |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2019 |
Předmět: |
0209 industrial biotechnology
Computer science Process (engineering) Automotive industry 02 engineering and technology Lean manufacturing lcsh:Technology value stream mapping lcsh:Chemistry 020901 industrial engineering & automation 0502 economics and business Added value General Materials Science A3 report Instrumentation lcsh:QH301-705.5 Fluid Flow and Transfer Processes business.industry lcsh:T Process Chemistry and Technology 05 social sciences General Engineering automotive industry Manufacturing engineering lcsh:QC1-999 Computer Science Applications Value stream mapping lcsh:Biology (General) lcsh:QD1-999 Order (business) lcsh:TA1-2040 Spare part Value (economics) lean manufacturing business lcsh:Engineering (General). Civil engineering (General) replacement part 050203 business & management lcsh:Physics |
Zdroj: | Applied Sciences Volume 9 Issue 18 Applied Sciences, Vol 9, Iss 18, p 3932 (2019) |
ISSN: | 2076-3417 |
DOI: | 10.3390/app9183932 |
Popis: | In today&rsquo s automotive industry, Lean production systems are used successfully to reduce delivery times. The current case study addresses a problem that affects an automotive company, which is the excessive delivery time of a spare part to its both national and international authorized dealers. In order to reduce the delivery time of this replacement part, the Lean Manufacturing methodology was used. For this purpose, the value stream mapping and the proposed A3 report are the tools used. With the use of these tools, activities that did not add any value are eliminated or modified in addition, the logistical flow of the modules of the door-side trim panel delivery process is improved. As a result, added value is increased, the delivery time is reduced (for Mexico) and the number of product variants is reduced. Now, the painting process is done by the authorized dealers, and the number of pieces used for every spare part was estimated. The study demonstrates that the integration of value stream mapping administrative/productive in conjunction with the A3 report proposal allows to identify and eliminate waste in the delivery process. |
Databáze: | OpenAIRE |
Externí odkaz: |