Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
Autor: | Khurana, K., Bagga, P. C. |
---|---|
Zdroj: | Zeitschrift für Operations-Research; October 1984, Vol. 28 Issue: 5 p163-174, 12p |
Abstrakt: | A special case of the flowshop problem of sequencingn jobs on two machines, to minimize the makespan, is solved under setup considerations and with time lags. |
Databáze: | Supplemental Index |
Externí odkaz: |