Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions

Autor: Khurana, K., Bagga, P. C.
Zdroj: Zeitschrift für Operations-Research; October 1984, Vol. 28 Issue: 5 p163-174, 12p
Abstrakt: A special case of the flowshop problem of sequencingn jobs on two machines, to minimize the makespan, is solved under setup considerations and with time lags.
Databáze: Supplemental Index