Popis: |
This thesis takes the form of two separate fractions. Theoretical context, in which the real estate developer, the construction project is defined, costs in connection therewith arise are characterized and also methods for analyzing these costs are mentioned, is Chapter 1. Practical fraction consisting of a cost analysis of model development company and model construction project, forms Chapter 2 and Chapter 3. In conclusion, the practical analysis outputs are interpreted and some recommendations to optimize costs are presented. |