Druhá etapa přeložky I/9 Dubice – Dolní Libchava
Autor: | Belda, Miroslav |
---|---|
Jazyk: | čeština |
Rok vydání: | 2013 |
Předmět: | |
Druh dokumentu: | masterThesis |
Popis: | Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section. |
Databáze: | Networked Digital Library of Theses & Dissertations |
Externí odkaz: |