Autor: |
Merrigan, Sarah Ruth, Chamberlain, Marcel, Escalante, Jose, McPherson, Zachary, Mitchell, Gabriele, Patel, Dylan, Tang, Yuqi, Zimmerman, William |
Rok vydání: |
2017 |
Druh dokumentu: |
Text |
Popis: |
This report includes the complete documentation of the 2017 Civil Engineering senior capstone project. The project is a theoretical design project based on a real, local project currently in production. The scope of the project includes widening the Broadway Boulevard Corridor from Highland Avenue through Warren Avenue in order to meet growing capacity demands. The new design expands Broadway Blvd to include six through lanes, three in each direction as well as a median, bus pullouts, improved curb and drainage features and new landscaping. The report is broken up into multiple sections. The first two sections, the Statement of Qualifications (SOQ) and the Design Summary Report (DSR) were completed during the Fall 2016 Semester. The remaining sections include the various technical reports completed in the Spring 2017 Semester in the following order: Pavement Design Report, Landscape Report, Traffic Analysis Report, Drainage Design Report, Structural Report, Plan Cost Estimate, and the Plan Sheets. |
Databáze: |
Networked Digital Library of Theses & Dissertations |
Externí odkaz: |
|