none
Autor: | Funk, Ma-Jui Lung, 馬瑞龍 |
---|---|
Rok vydání: | 2018 |
Druh dokumentu: | 學位論文 ; thesis |
Popis: | 106 The semi-conductor industry has a capital expenditure relatively higher than that of traditional manufacturers and technology industry. With industry characteristics of short product life cycles and high technical replacement rate, major companies are forced by clients to quickly enter the market with low cost and innovative techniques. This study applies the research methods of X-Factory theory and Little’s law to find out the bottleneck area of production capacity in a semi-conductor company. With a default of ten processing work station in the semi-conductor company, if the information of demand in the semi-conductor market is fixed, how to adopt the most efficient method to find out that the bottleneck area of the semi-conductor company is in need of improvement, so as to effectively solve problems such as excessive inventory, long production time, and high production cost in the shortest possible time, therefore, maximizing the benefits of production and capital. This research model of this study is mainly the use of Tecnomatix Plant Simulation 13 provided by Siemen to simulate relevant production performance data of the company. Based on initial numbers and by using the SPSS software for regression analysis, key factors in affecting the operating efficiency of the company are found. Initial determination is made to understand where the key bottleneck area that affects the overall benefit of the company is, and eventually make comparisons between the verified solution and starting solution so as to verify that such solution is feasible, which in turn helps find the best production capacity distribution in the future. |
Databáze: | Networked Digital Library of Theses & Dissertations |
Externí odkaz: |