The study of Building Information Modeling technology enhance the value of electromechanical industry value chain
Autor: | Chung-Min Lee, 李宗民 |
---|---|
Rok vydání: | 2015 |
Druh dokumentu: | 學位論文 ; thesis |
Popis: | 103 Electro-Mechanical Industry is normally processed in relatively mid-late building construction life cycle. Lacking integration at early design stage and short lead time eventually bring negative effect to construction duration and quality. The unique contract out model and differential professional construction of Architectural Engineering, as a result, it make things difficult to systematically integrate engineering relevant expert’s opinions. Division of specialized engineering is obvious on practical application; on the other hand, obscure cooperation model often exists in-between different engineering. Electro-Mechanical Industry is facing same predicament repeatedly and struggling on finding the perfect solution. Facing with this dilemma, the Western countries gradually adopt Building Information Modeling system (BIM) to cope with the issue. BIM not only offer a communication platform as an integrating tool, but also assist project teams on concept planning prior to construction. Even more, deliver complete necessary digital information for subsequent construction phases, construction management and building operation. Deploying and adopting BIM successfully minimize conflict of the construction, at the same time have effective cost control and schedule control. This study supports that BIM can be advantage and a solution answers to Electro-Mechanical Industry’s need of enhance competitiveness. It’s also a strategic action that deserves our further investigation and study. Thus this study assumes that advantages of Electro-Mechanical Industry’s adopting BIM are : 1. With help of conflict checking, conflictions could be revealed and solved beforehand; at the same time, accelerate construction schedule with sustainable quality. 2. Having shorter reaction time and minimized mistakes to customers’ request change. 3. Reduce disputes caused by different cognitive by using 3D visual content during discussion with customers. 4. By using BIM-4D to ensure rationality and safety of construction, thus reduce a lot problems encountered in construction. 5. BIM system database can be integrated as subsequent use in Construct Building Facility Management System, and become the reference book to device or facility maintenance of buildings. Considering current industry circumstance, it is not easy to deploy BIM to Electro-Mechanical Industry by oneself. Taking advantage of advancement and optimization of BIM LOD, industry could strive to present complete look of each stage, also make it the reference to strategically planning Key words:Building Information Modeling; Electro Mechanical Industry Value Chain; Promote Value. |
Databáze: | Networked Digital Library of Theses & Dissertations |
Externí odkaz: |