Full scale study of chemically enhanced primary treatment in Riviera de Sao Lourenco, Brazil

Autor: Bourke, Mike R. (Mike Robert), 1976
Jazyk: angličtina
Rok vydání: 2000
Předmět:
Druh dokumentu: Diplomová práce
Popis: Thesis (M.Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2000.
Includes bibliographical references (leaves 148-149).
Effective, low-cost wastewater treatment that permits removal of pollutants and the deactivation of pathogens is essential to protect public health. An emerging technology that has been proposed to accomplish this goal, is Chemically Enhanced Primary Treatment, or CEPT. CEPT vastly improves the effectiveness of an existing wastewater treatment facility, enabling the plant to not only meet increasing flow demands, but to attain higher removal efficiencies at the same time. Similarly, in the case of a new treatment facility, it can be designed to treat larger amounts of flow, and/or the designed size can be decreased by as much as half, and still meet expected capacity. The governing principle behind CEPT is the enhancement of the primary settling process through the addition of low dosages of metal salts and extremely small amounts of an anionic polymer. These additions cause the particulate matter in the wastewater to coagulate and flocculate, thus creating larger particles, which in turn settle at a much faster rate. This thesis looks at the different forms by which CEPT can be implemented in wastewater lagoon systems, namely "pre-pond" and "in-pond" CEPT. While there is discussion of numerous CEPT plants, special attention is paid to the full-scale study and analysis of the CEPT upgrade at Riviera de Sao Lourenco, Brazil. This plant conducted full-scale tests of both "prepond" and "in-pond" CEPT. This thesis compares the advantages and disadvantages of "prepond" and "in-pond" CEPT, along with the effectiveness of each.
by Mike R. Bourke, Jr.
M.Eng.
Databáze: Networked Digital Library of Theses & Dissertations