Minimising Makespan in the Two-Machine Flow-Shop with Release Times

Autor: Tadei, R., Gupta, J. N. D., Della Croce, F., Cortesi, M.
Zdroj: The Journal of the Operational Research Society, 1998 Jan 01. 49(1), 77-85.
Databáze: JSTOR Journals