Case study of “project controlling” on a large HOPSCA project in China

Autor: Wang, Chun, Li, Baiyi, Li, Baizhan, Baldwin, Andrew
Zdroj: Engineering, Construction and Architectural Management, 2017, Vol. 24, Issue 6, pp. 862-874.
Databáze: Emerald Insight