on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model
Autor: | Li, Fang, Xianyi, Gao, Xin, Ma |
---|---|
Zdroj: | In Systems Engineering Procedia 2012 4:359-365 |
Databáze: | ScienceDirect |
Externí odkaz: |