Autor: |
Gaëlle Guesdon, Ana de Santiago-Martín, Sébastien Raymond, Hamdi Messaoud, Arthur Michaux, Samuel Roy, Rosa Galvez |
Jazyk: |
angličtina |
Rok vydání: |
2016 |
Předmět: |
|
Zdroj: |
Water, Vol 8, Iss 7, p 285 (2016) |
Druh dokumentu: |
article |
ISSN: |
2073-4441 |
DOI: |
10.3390/w8070285 |
Popis: |
Winter road network management is a source of anthropogenic salinity in the Saint-Augustin Lake watershed (Quebec City, QC, Canada). To prevent the potential impact caused by road runoff involving de-icing salts (NaCl) and trace metals (Cd and Pb) on the watershed, a full-scale treatment chain system (including a detention basin, a filtering bed, and a constructed wetland) was built. Average Cl and Na concentrations in groundwater were higher in wells affected by road network (125 mg/L Cl and 64 mg/L Na) than in control wells (13 mg/L Cl and 33 mg/L Na) suggesting a contamination by de-icing salts. The monitoring of influent and effluent surface water in the treatment system has shown a seasonal dependence in NaCl concentrations and electrical conductivity values, being the highest in summer, linked with the lower precipitation and higher temperature. Concentration ranges were as follows: 114–846 mg/L Na and 158–1757 mg/L Cl (summer) > 61–559 mg/L Na and 63–799 mg/L Cl (spring and autumn). The treatment system removal efficiency was significant, however with seasonal variations: 16%–20% Cl, 3%–25% Na, 7%–10% Cd and 7%–36% Pb. The treatment system has shown an interesting potential to mitigate the impact of anthropogenic salinity at watershed scale with higher expected performances in the subsequent years of operation. |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|