Autor: |
Roberto Benato, İbrahim Balanuye, Fatih Köksal, Nurhan Ozan, Ercüment Özdemirci |
Jazyk: |
angličtina |
Rok vydání: |
2018 |
Předmět: |
|
Zdroj: |
Energies, Vol 11, Iss 1, p 164 (2018) |
Druh dokumentu: |
article |
ISSN: |
1996-1073 |
DOI: |
10.3390/en11010164 |
Popis: |
This paper describes the 400 kV AC submarine link under the Dardanelles Strait composed of 12 submarine armoured single-core cross-linked polyethylene (XLPE)-insulated cables (plus a back-up power cable). The link consists of two parallel-operated double-circuit links named Lâpseki–Sütlüce I and Lâpseki–Sütlüce II. The transmissible power is 4000 MW (1000 MW per circuit) and the average length for a single-core cable is about 4.6 km: the submarine cables are part of overhead lines. This paper gives a wide account of the cable installations and, chiefly, of the cable protections on the seabed: different protection choices were extensively used (i.e., water jetting and mattressing). |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|