Autor: |
Hejducki Zdzisław, Łodożyński Łukasz |
Jazyk: |
English<br />French |
Rok vydání: |
2018 |
Předmět: |
|
Zdroj: |
MATEC Web of Conferences, Vol 251, p 05011 (2018) |
Druh dokumentu: |
article |
ISSN: |
2261-236X |
DOI: |
10.1051/matecconf/201825105011 |
Popis: |
The topic of the paper is referred to optimization model for multiobjective solutions for construction management. It is known in literature as Time Coupling Methods (TCM). It presents another approach to scheduling methods from known methods like LSM, CPM/PERT, LOC, RSM. TCM is based on couplings that bounds activities in technology and management. The new modifications to TCM will be presented that add flexibility when dealing with complex civil engineering problems. |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|