Proactive Production Scheduling Approach for Off-Site Construction with Due Date Uncertainty

Autor: Taehoon Kim, Yong-Woo Kim
Jazyk: angličtina
Rok vydání: 2024
Předmět:
Zdroj: Applied Sciences, Vol 14, Iss 23, p 11017 (2024)
Druh dokumentu: article
ISSN: 2076-3417
DOI: 10.3390/app142311017
Popis: This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that simulates and evaluates the total tardiness of the schedule at a certain confidence level with contractor schedule uncertainty and a GA-based production schedule optimization module that finds an optimal schedule through iterative schedule generation and evaluation using a PC production simulation module. The experimental study shows that the proposed model can find the best schedule with 303.8 h of tardiness at a 100% confidence level, followed by NEHedd 324.7 h, basic GA 328.5 h, and EDD 335.8 h. The results of this study will help PC production schedulers to perform robustly despite contractors’ schedule changes and will thus contribute to the successful completion of PC construction projects.
Databáze: Directory of Open Access Journals