Popis: |
Abstract In order to safeguard the surface structures from mining damage while optimizing the liberation of coal resources under the dense surface buildings of the Cedi River coal mine. Considering that the analysis of the structure and type of surface buildings and the geological mining conditions of the mine, a wide strip mining design with a retention width of 70 m and a mining width of 50 m was finally determined by using the pressure arch theory and Wilson’s theory, combined with the actual layout of working faces 51,002, 51,004 and 51,006 at the site.The strip mining design is verified by probability integral method and FLAC3D numerical simulation calculation respectively, The findings indicate that the highest value of earth surface subsidence created by the mining of the wide strip is 210 mm, the surface horizontal deformation value is 1.0 to − 1.4 mm/m, the damage to surface buildings is less than Level I, which satisfying the prerequisites of the surface building protection level, and can realize the continuous advancement of mine 51,002, 51,004 and 51,006 working faces, The coal pillars of the retained strip have sufficient support strength and long-term consistency, and the movement and deformation of the overburden after mining will not cause undulating subsidence of the surface, which effectively solve the mine's technical difficulties in safely coal mining under surface buildings. |