Tiempo no productivo en pozos de dos secciones, caso de estudio Ecuador
Autor: | Diego Ayala Trujillo, Henry Fernando Torres Quitiguiña, Marco Vinicio Loaiza Cordova, Silvia Alexandra Ayala Trujillo |
---|---|
Jazyk: | English<br />Spanish; Castilian<br />Portuguese |
Rok vydání: | 2018 |
Předmět: | |
Zdroj: | Revista Fuentes El Reventón Energético, Vol 16, Iss 1, Pp 7-17 (2018) |
Druh dokumentu: | article |
ISSN: | 1657-6527 2145-8502 |
DOI: | 10.18273/revfue.v16n1-2018001 |
Popis: | Considering the current costs for drilling services within a market being completely unstable that have placed the oil barrel at lowest prices in the last decade, it is extremely important to reduce every activity that delay the normal course of well drilling. The proposal for a resource of planning which is obtained from the present research. This resource was developed for engineers and operators aiming at ending of wellbore within scheduled time with the stablished budget, in this way being the operation successful in every well into more quick tasks with higher return on investment by starting early the well production. The economic impact of unplanned events is exposed as a result from this paper. |
Databáze: | Directory of Open Access Journals |
Externí odkaz: |