Autor: |
Wang H.Y., Yang F.Y., Gao J.F. |
Jazyk: |
English<br />French |
Rok vydání: |
2017 |
Předmět: |
|
Zdroj: |
MATEC Web of Conferences, Vol 124, p 01001 (2017) |
Druh dokumentu: |
article |
ISSN: |
2261-236X |
DOI: |
10.1051/matecconf/201712401001 |
Popis: |
It is very important of high-speed railway construction surveying and mapping. Especially the establishment of construction survey control network and searching aiming at layout, measurement, data processing of adjustment calculation of the horizontal control network and the elevation control network. The most important part is the establishment of CP II and CPIII control network. The elevation control mainly adopts second order leveling. Horizontal and elevation accuracy must to meet the requirements of high speed railway construction survey. |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|