Cost-effectiveness of comprehensive preventive measures for coal workers’ pneumoconiosis in China

Autor: Xiaoyan Ge, Kai Cui, Honglin Ma, Siqi Zhao, Weihan Meng, Wenbo Wang
Jazyk: angličtina
Rok vydání: 2022
Předmět:
Zdroj: BMC Health Services Research, Vol 22, Iss 1, Pp 1-10 (2022)
Druh dokumentu: article
ISSN: 1472-6963
DOI: 10.1186/s12913-022-07654-7
Popis: Abstract Background Coal workers’ pneumoconiosis (CWP) remains one of the most severe occupational diseases in China. Despite the implementation of CWP comprehensive preventive measures, the unreasonable allocation of investment by coal enterprises limits the effect of preventing CWP, especially when the health resources are inadequate. This study aims to evaluate the cost-effectiveness of comprehensive measures for CWP from the perspective of coal enterprises. Methods Comprehensive measures and two primary interventions (engineering controls and individual protective equipment) were selected. A time-dependent Markov model was developed to evaluate cost and quality-adjusted life-years (QALYs). The input data were collected from the survey and literature. A hypothetical null situation, in which the currently implemented interventions were eliminated, was used as a comparator based on the generalised cost-effectiveness analysis (GCEA) recommended by the World Health Organization (WHO). The primary outcomes of the model were reported in terms of incremental cost-effectiveness ratios (ICERs). Uncertainty was verified using one-way and probabilistic sensitivity analyses. Results The QALYs of the comprehensive measures, engineering controls, and individual protective equipment were 17.60, 17.50, and 16.85 years, respectively. Compared with null, the ICERs of the interventions were 65,044.73, 30,865.15, and 86,952.41 RMB/QALY, respectively. Individual protective equipment was dominated by an ICER of -11,416.02 RMB/QALY compared to engineering controls. Sensitivity analysis suggested the robustness of the results. Conclusions The comprehensive preventive measures for CWP that are currently implemented in Chinese state-owned mines are cost-effective. In comprehensive measures, engineering controls are more cost-effective than individual protective equipment. Investment in engineering controls should be increased to improve the cost-effectiveness of preventing CWP.
Databáze: Directory of Open Access Journals
Nepřihlášeným uživatelům se plný text nezobrazuje