Autor: |
Elisabeta Spunei, Ionel Turcu, Alina Vișan |
Jazyk: |
angličtina |
Rok vydání: |
2021 |
Předmět: |
|
Zdroj: |
Studia Universitatis Babeş-Bolyai. Engineering, Vol 66, Iss 1, Pp 45-56 (2021) |
Druh dokumentu: |
article |
ISSN: |
2734-7680 |
DOI: |
10.24193/subbeng.2021.1.5 |
Popis: |
The paper presents a laboratory micro hydroelectric power plant destined to applicative activities. The hydraulic turbine is a Pelton turbine, rebuilt by fast prototyping in Geomagic Design X and printed on a 3 D printer. The turbine casing and the afferent ele-ments are made in-house. The hydrogenator is synchronous being an alternator from a Dacia vehicle. The hydrogenerator load is constituted by 3 groups of light bulbs. We analysed the working of the micro-hydroelectric power plant in idle run and for different loads. As a result of the analysis we found out that it stably works for different loads and by its open construction it is useful for de-veloping students’ ability to understand the phenomena. The installation designed and executed is useful for the engineering students as the pandemic forbids the thematical visits in hydro-energetic facilities. |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|