Autor: |
Peter Kitak, Lovro Belak, Jože Pihler, Janez Ribič |
Jazyk: |
angličtina |
Rok vydání: |
2021 |
Předmět: |
|
Zdroj: |
Applied Sciences, Vol 11, Iss 24, p 11806 (2021) |
Druh dokumentu: |
article |
ISSN: |
2076-3417 |
DOI: |
10.3390/app112411806 |
Popis: |
The paper deals with the reliability-centered maintenance (RCM) of a transmission substation. The process of the planning and actual performance of maintenance was carried out using an optimization algorithm. This maintenance procedure represents the maintenance management and included reliability of the power system operation, maintenance costs, and associated risks. The originality of the paper lies in the integrated treatment of all maintenance processes that are included in the pre-processing and used in the optimization process for reliability-centered maintenance. The optimization algorithm of transmission substation maintenance was tested in practice on the equipment and components of an existing 400/110–220/110 kV substation in the Slovenian electricity transmission system. A comparison analysis was also carried out of the past time-based maintenance (TBM) and the new reliability-centered maintenance (RCM), on the basis of the optimization algorithm. |
Databáze: |
Directory of Open Access Journals |
Externí odkaz: |
|