Development and test run of civil engineering schedule acceleration model through ant colony optimization

Autor: Chen Wang, Hamzah Abdul-Rahman, Pui See Chow
Jazyk: angličtina
Rok vydání: 2016
Předmět:
Zdroj: Journal of Civil Engineering and Management, Vol 22, Iss 8 (2016)
Druh dokumentu: article
ISSN: 13923730
1392-3730
1822-3605
DOI: 10.3846/13923730.2014.945954
Popis: The traditional scheduling tool Critical Path Method (CPM) exhibits limitations in computational insufficiency due to exhaustive enumeration. Ant Colony Optimization (ACO) was therefore applied as a metaheuristic inspired by the ants behavior in foraging activities. A model development team was formed among construction engineers, IT professionals, and Mathematicians to develop a schedule acceleration model by integrating ACO into CPM to ensure proper resources allocated on critical path. The developed model CSAM-ACO targets on schedule acceleration by allocating resources on the newly found critical path after two stages of computation. The trial run proved CSAM-ACO model more favorable compared with CPM. First published online: 27 Jan 2016
Databáze: Directory of Open Access Journals