Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
Autor: | Shih-Hsu Wang, Wei-Chih Wang, Pei-Yuan Hsu, Ci-Hao Chen, Kun-Chi Wang |
---|---|
Jazyk: | angličtina |
Rok vydání: | 2016 |
Předmět: | |
Zdroj: | Journal of Civil Engineering and Management, Vol 22, Iss 7 (2016) |
Druh dokumentu: | article |
ISSN: | 13923730 1392-3730 1822-3605 |
DOI: | 10.3846/13923730.2014.928363 |
Popis: | An engineering consultant firm needs to allocate engineers to supervise a highway construction project in each month during the construction phase. Properly assigning the supervision engineers under a cost-plus-fixed-fee contract has been a key factor affecting the profitability of the firm and the quality assurance of the project. Assigning too many engineers will be a waste, while allocating too few engineers may harm the supervision quality. This work proposes a two-stage model to develop engineering S-curves (called ES-curves) for planning and controlling the engineering supervision schedule. In the planning stage, a predictive ES-curve model is established based on historical ES-curves. In the controlling stage, an ES-curve is built according to the relationships between the engineering progress and construction progress. A cluster analysis and regression analysis are applied to the model development. A case study demonstrates that the produced ES-curves can help management in planning and evaluating when to increase or decrease the number of supervision engineers assigned to a project. |
Databáze: | Directory of Open Access Journals |
Externí odkaz: |