The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model

Autor: Hamim Tohari, Ahmad Kudhori, Hedi Pandowo
Jazyk: angličtina
Rok vydání: 2023
Předmět:
Zdroj: Buana Information Technology and Computer Sciences, Vol 4, Iss 1, Pp 19-23 (2023)
Druh dokumentu: article
ISSN: 2715-2448
2715-7199
DOI: 10.36805/bit-cs.v4i1.2770
Popis: Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).
Databáze: Directory of Open Access Journals