Popis: |
Through the analysis on the drilling hole gas drainage effect(2225 working face crossing seam drainage, K2air way drilling field layout, crossing seam drainage gas in K3b coal seam),it is found that hole sealing technology directly affects gas drainage. Based on the original hole sealing technology and combining with field conditions, an improved drilling scheme for transportation roadway was proposed, considering the drilling layout, sealing material and depth, grouting time, pre-plunging depth. Test results of the scheme showed that, with a rise in the cost and drilling pressure relief time, the pressuring-relief gas drainage amount was greatly increased, the drilling field pre-pumping concentration was enhanced to 4.4times, the drainage efficiency was improved. |