Productivity and Costs of Mechanized Skidding operations at Sao Hill Forest Plantation, Tanzania

Autor: Gilberth Prosper Temba, Ernest William Mauya, George Ansigar Migunga
Jazyk: angličtina
Rok vydání: 2024
Předmět:
Zdroj: Forest Science and Technology, Vol 20, Iss 1, Pp 91-103 (2024)
Druh dokumentu: article
ISSN: 21580103
2158-0715
2158-0103
DOI: 10.1080/21580103.2023.2299260
Popis: AbstractDue to global advancement of technology in forest operations, utilization of advanced machineries such as grapple skidder (GS) in timber harvesting has been increasing in the last decades. However, in order to understand their contribution in sustainable harvesting operations, it is important to understand their performance under different operating environment. Therefore, this study aimed to quantify productivity and cost of mechanised skidding operations at Sao Hill Forest plantation (SHFP). Six variables; diameter at a breast height (dbh), tree height, skidding distance, slope, costs, and cycle time (determined using detailed continuous time study) were collected in 120 GS observations.GS productivity and costs were estimated using productive machine hour (PMH) and delays inclusion approach. Regression models were developed using a generalized linear model (GLM) approach. GS productivity under PMH was 2.6% higher than the one including delay time, while skidding costs was 2.1% higher in the approach including delays. This study revealed significant variations (p-value
Databáze: Directory of Open Access Journals