Experience with Long-pulse Operation of the PIP2IT Warm Front End
Autor: | Shemyakin, A., Carneiro, J. -P., Chen, A., Frolov, D., Hanna, B., Neswold, R., Prost, L., Saewert, G., Saini, A., Scarpine, V., Warner, A., Wu, J. -Y., Richard, C. |
---|---|
Rok vydání: | 2019 |
Předmět: | |
Druh dokumentu: | Working Paper |
Popis: | The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented. Comment: 4 pages, NAPAC2019 |
Databáze: | arXiv |
Externí odkaz: |