Status of the warm front end of PIP-II injector test
Autor: | Shemyakin, A., Alvarez, M., Andrews, R., Baffes, C., Carneiro, J. -P., Chen, A., Derwent, P. F., Edelen, J. P., Frolov, D., Hanna, B., Prost, L., Saini, A., Saewert, G., Scarpine, V., Sista, V. L. S., Steimel, J., Sun, D., Warner, A. |
---|---|
Rok vydání: | 2018 |
Předmět: | |
Druh dokumentu: | Working Paper |
Popis: | The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end. Comment: 4 pp. 8th International Particle Accelerator Conference (IPAC 2017) 14-19 May 2017. Copenhagen, Denmark |
Databáze: | arXiv |
Externí odkaz: |