Initial Results from the MAJORANA DEMONSTRATOR
Autor: | Elliott, S. R., Abgrall, N., Arnquist, I. J., Avignone III, F. T., Barabash, A. S., Bertrand, F. E., Bradley, A. W., Brudanin, V., Busch, M., Buuck, M., Caldwell, T. S., Chan, Y-D., Christofferson, C. D., Chu, P. -H., Cuesta, C., Detwiler, J. A., Dunagan, C., Efremenko, Yu., Ejiri, H., Fullmer, A., Galindo-Uribarri, A., Gilliss, T., Giovanetti, G. K., Green, M. P., Gruszko, J., Guinn, I. S., Guiseppe, V. E., Henning, R., Hoppe, E. W., Howe, M. A., Jasinski, B. R., Keeter, K. J., Kidd, M. F., Konovalov, S. I., Kouzes, R. T., Leon, J., Lopez, A. M., MacMullin, J., Martin, R. D., Massarczyk, R., Meijer, S. J., Mertens, S., Orrell, J. L., O'Shaughnessy, C., Poon, A. W. P., Radford, D. C., Rager, J., Rielage, K., Robertson, R. G. H., Romero-Romero, E., Shanks, B., Shirchenko, M., Suriano, A. M., Tedeschi, D., Trimble, J. E., Varner, R. L., Vasilyev, S., Vetter, K., Vorren, K., White, B. R., Wilkerson, J. F., Wiseman, C., Xu, W., Yakushev, E., Yu, C. -H., Yumatov, V., Zhitnikov, I. |
---|---|
Rok vydání: | 2016 |
Předmět: | |
Druh dokumentu: | Working Paper |
DOI: | 10.1088/1742-6596/888/1/012035 |
Popis: | Neutrinoless double-beta decay searches seek to determine the nature of neutrinos, the existence of a lepton violating process, and the effective Majorana neutrino mass. The {\sc Majorana} Collaboration is assembling an array of high purity Ge detectors to search for neutrinoless double-beta decay in $^{76}$Ge. The {\sc Majorana Demonstrator} is composed of 44.8~kg (29.7 kg enriched in $^{76}$Ge) of Ge detectors in total, split between two modules contained in a low background shield at the Sanford Underground Research Facility in Lead, South Dakota. The initial goals of the {\sc Demonstrator} are to establish the required background and scalability of a Ge-based, next-generation, tonne-scale experiment. Following a commissioning run that began in 2015, the first detector module started physics data production in early 2016. We will discuss initial results of the Module 1 commissioning and first physics run, as well as the status and potential physics reach of the full {\sc Majorana Demonstrator} experiment. The collaboration plans to complete the assembly of the second detector module by mid-2016 to begin full data production with the entire array. Comment: Neutrino 2016 proceeding |
Databáze: | arXiv |
Externí odkaz: |