Popis: |
The section of the E75 motorway, from Grabovnica to Levosoje, which represents the southern leg of the Corridor X, is divided into 5 sections. For the needs of realization of the main project, the vertical seating of the terrain was performed. In parallel with the work on the shutter, it was necessary to provide support to the field through the construction of supporting walls on the slopes. On the second section in line, from Grdelica to Caričina Dolina, a support wall was built, which is the subject of observation. In this paper we give an overview of all the calculations and processes in the design of the project of observing this support structure in the horizontal plane with the aim of determining all movements on an object larger than 2 cm. |