Church of St. George on the Hill in Lopatinec: Art Historical analysis and Restoration and Conservation work after the collapse of the Church in 2008

Autor: Bedić, Asja
Přispěvatelé: Špikić, Marko, Šourek, Danko
Jazyk: chorvatština
Rok vydání: 2022
Předmět:
Popis: U ovom diplomskom radu u prvom dijelu predstavit će se povijesnoumjetnička analiza crkve Sv. Jurja na Bregu, s naglaskom na povijest izgradnje crkve i cinktora te opis inventara crkve. Moguće je pratiti razvoj crkve od prvotne kapele Majke Božje Lauretanske do župne crkve i na koncu do značajnog hodočasničkog središta u periodu od 1739. do otprilike 1779. godine. Oltari, propovjedaonica i pjevalište također nastaju u tom vremenskom okviru i mogu se pratiti njihovi razvoji u kanonskim vizitacijama. U drugom dijelu rada riječ će biti o urušavanju zvonika i crkve 2008. godine. Hidroizolacijski radovi koji su prethodili urušavanju započeti su 2007. godine, a do urušavanja je došlo 4. lipnja 2008. godine nakon što su otkopani temelji bili izloženi atmosferilijama. Konzervatorsko-restauratorski radovi koji su uslijedili obavljali su se na crkvi, zvoniku i inventaru crkve u periodu od 2008. do otprilike 2012. godine, a radovi na cinktoru još uvijek su u tijeku. Naglasak će se staviti i na problematiku rekonstrukcije zvonika koji je u ovom slučaju imao simboličnu ulogu – od zavičajnog simbola među mještanima do simbola urušavanje crkve 2008. godine. The first part of this thesis presents the art historical analysis of the Church of St. George on the Hill, with focus on the history of construction of the church and its graveyard wall, and on the description of church's inventory. The church's development from the chapel, parish church and its final form of the pilgrimage place can be tracked from 1739 to approximately 1779. The pulpit, altars and the choir were being built during that same period and the information about their development can be found in the Canonical visitations. The second part of this thesis focuses on the collapse of the church and its bell tower which occurred in 2008. The event that preceded the collapse was the waterproofing work which started in 2007, during which the foundations of the church and its bell tower got exposed to rain and other external influences which finally resulted in a collapse (June 4th, 2008.). The restoration and conservation work on the church, it's bell tower and its inventory took place in 2008 and got completed around 2012, but the work on the graveyard wall is still in progress. Emphasis will also be placed on the bell tower which has a very symbolic role with the locals – once a symbol of their identity and now a symbol of the imminent collapse and reconstruction.
Databáze: OpenAIRE