Supervisory Control of Complementary Activities for the Execution of the Ciudadela Verde Project in Bucaramanga Santander

Autor: Arciniegas-Ruiz, Marleny
Přispěvatelé: Báez-Maríño, Héctor Andrés, Torres-Barreto, Lina María, Rondón-Ordóñez, Jaime
Jazyk: Spanish; Castilian
Rok vydání: 2023
Předmět:
Popis: Digital
El proyecto de estudio se basa en la construcción de una ciudadela de edificios tipo interés social (VIS) mediante la realización del proceso constructivo tipo túnel (industrializado) el cual es identificado como “proyecto ciudadela verde, en este se realizó una revisión y supervisión mediante el ejercicio práctico, controlando y verificando que los contratistas cumplan con las especificaciones técnicas con lo definido en los planos estructurales, especificaciones técnicas, cumpliendo de igual manera con los tiempos establecidos por parte del residente y director de obra. Este seguimiento se hace necesario debido a que durante la construcción de edificaciones correspondientes a un proyecto de vivienda de interés social (VIS) se pueden presentar construcciones complejas, cambios constantes y adecuaciones según la realidad que se presenta en el momento de ejecución sin dejar de lado que se debe garantizar la calidad en el momento de la entrega al comprador y su uso a través de los años de uso. También se verifica mediante los checklist que los contratistas cumplan con los rendimientos con los cuales se comprometen en el comité de obra, esto para que la obra avance de manera muy constante y así brindarles la seguridad a nuestros clientes. En el presente documento se plasma el proceso constructivo evidenciado durante el desarrollo de las practicas, las actividades a realizar, el orden de cada una de ellas especificando su importancia y razón de su secuencia, las especificaciones técnicas planteadas y consideradas por los diseñadores competentes para cada una de las dependencias del desarrollo del proyecto y los rendimientos del desarrollo de las actividades.
The study project is based on the construction of a citadel of social interest type buildings (VIS) by carrying out the tunnel-type construction process (industrialized) which is identified as "green citadel project", in which a review and supervision was carried out through the practical exercise, controlling and verifying that the contractors comply with the technical specifications as defined in the structural plans, technical specifications, complying in the same way with the times established by the resident and construction manager. This follow-up is necessary because during the construction of buildings corresponding to a social interest housing project (VIS) complex constructions, constant changes and adjustments can be presented according to the reality that is presented at the time of execution without leaving aside that quality must be guaranteed at the time of delivery to the buyer and its use through the years of use. It is also verified through the checklist that the contractors comply with the performance with which they are committed in the work committee, this so that the work progresses in a very constant manner and thus provide security to our clients. This document reflects the construction process evidenced during the development of the practices, the activities to be carried out, the order of each of them specifying their importance and reason for their sequence, the technical specifications proposed and considered by the competent designers for each one of the dependencies of the development of the project and the yields of the development of the activities.
Pregrado
Ingeniero(a) Civil
Introducción 20 Objetivos 21 Objetivo General 21 Objetivos Específicos 21 Marco Teórico 22 Viviendas de Interés Social (VIS) 22 Mortero de Pega y Pañete 22 Como se Controla la Calidad del Mortero 22 Cuál es la Resistencia del Mortero 23 Mampostería no Estructural: 24 Proceso Constructivo 24 Plomadas 26 Partes que Componen una Plomada 27 Plomada Laser 28 Acero de Refuerzo 28 Traslapos 29 Estribos 29 Concreto Industrializado 30 Marco Legal 31 Descripción de la Empresa 32 Ubicación 32 Visión 32 Misión 32 Valores Corporativos 32 Política de Calidad 33 Objetivos de Calidad 33 Descripción del Proyecto 34 Proyecto Ciudadela Verde 34 Metodología 35 Proceso Constructivo de Una Torre Tipo 35 Ubicación Georreferenciada 35 Actividades Preliminares, Replanteo y Movimiento de Tierras 36 Cimentación 36 Ubicación de Muros 37 Instalación de Acero. 38 Instalación Hidrosanitarias y Eléctricas 39 Pinado del Trazo. 39 Encofrado de los Elementos. 40 Vaciado de Concreto 46 Desencofrado del Elemento 52 Supervisión y Control de Actividades 54 Cimentación Torre 3 54 Revisión de Fundidas de Apartamentos 62 Supervisión de Elementos no Estructurales (Mampostería) 67 Verificación de Rendimientos y Check List 75 Concretos Fundida Apartamentos 75 Rendimiento Ductolon 79 Rendimiento A.C.P.M 80 Check List de Estructura 80 Conclusiones 83 Referencias Bibliográficas 84