Popis: |
In this study, the problems in the Eti Gümüş Co. Silver Mine due to high moisture content of feed ore to the plant are studied. The plant was designed for 6.5-7%. moisture content However in practice the moisture content of run of mine ore is around 15-30% leading to considerable decrease in performance and efficiency of crusher. For solving these problems, drying and stockpiling applied in reducing the moisture content before feeding the high moisture run of mine ore to the plant are investigated. The stockpiles constructed during drying and feeding them to the plant are explained in detail. Increases in recovery depending on these applications are assessed. |