Organizing the construction of the house in Varaždin
Autor: | Miketek, Marina |
---|---|
Přispěvatelé: | Amadori, Mirna |
Jazyk: | chorvatština |
Rok vydání: | 2016 |
Předmět: |
bill of quantities
construction management measurement book site scheme TEHNIČKE ZNANOSTI. Građevinarstvo. Organizacija i tehnologija građenja TECHNICAL SCIENCES. Civil Engineering. Construction Organization and Technology kalkulacija shema gradilišta vremenski plan izvođenja work schedule organizacija građenja troškovnik calculations dokaznica mjera |
Popis: | Rad je koncipiran kao projekt organizacije građenja, potkrijepljen teorijskom obradom tematike, gdje su analizirani potrebni resursi, vrijeme i troškovi na temelju glavnog projekta koji je dobiven od izvođača radova Građevinski obrt „Dom“. Podaci korišteni u izradi ovog rada prikupljeni su iz projektne dokumentacije, analize tržišta u suradnji s renomiranim izvođačima radova, stručne literature, te interneta i bilješki s predavanja iz kolegija Organizacija građenja. Ovim radom analizirani su grubi građevinski radovi te dani slijedeći elementi organizacije građenja: tehnički opis, troškovnik s dokaznicom mjera, shema gradilišta, kalkulacija i vremenski plan izvođenja radova. Prilikom izrade vremenskog plana, radi bolje optimalizacije vremena, korišten je softverski alat Microsoft Project. Projektom organizacije građenja dobivena je ukupna cijena koštanja radova u iznosu od 816.613,30 kn, te ukupno trajanje izgradnje od 119 radnih dana. The thesis was conceptualized as an construction management project, substantiated by the theoretical processing of the topic, wherein analyzed required resources, time and costs based on the main project which was obtained from contractor building company "Dom". Data used in the preparation of this study was collected from the project documentation, market analysis in cooperation with reputable contractor, professional literature, Internet and lecture notes from college of Construction management. This thesis has analyzed the basic construction works and reviewed following elements of organization design: technical specifications, bill of quantities with measurement book, site scheme, calculations and work schedule. In process of creating work schedule, Microsoft Project software tool was used for better optimization of time. The construction management project obtained the total cost of works in the amount of 816,613.30 kn, and the total duration of the construction of 119 working days. |
Databáze: | OpenAIRE |
Externí odkaz: |