Organization of construction of production - business - storage hall in Ljubeščica

Autor: Borovec, Saša
Přispěvatelé: Amadori, Mirna
Jazyk: chorvatština
Rok vydání: 2020
Předmět:
Popis: Završnim radom prikazan je cjelokupni proces organizacije građenja. Prije svega, bilo je potrebno izraditi tehnički opis građevine, te opisati tehnologiju izvođenja građevinskih radova. Bitno je spomenuti opremu i materijale koji se koriste tokom izgradnje građevine. Na temelju dostupne projektne dokumentacije, izračunata je dokaznica mjera, a analizom cijena određena jedinična cijenu za svaku stavku građevinskih radova.Troškovnikom prikazujemo ukupnu cijenu izvođenja radova, dok su obrtnički radovi i opremanje interijera zaseban projekt. Cijena izvođenja radova iznosi 2.377,885 kuna, što je vidljivo iz rekapitulacije troškova. Predviđeno je da realizacija radova bude obuhvaćena u 4 mjeseca, odnosno 83 radna dana. Točnije radovi počinju sa 01.09.2020.g., a završetak radova se očekuje 05.12.2020.g. Vremenski prikaz početka i završetka građevinskih radova prikazan je gantogramom, odnosno grafom čije koordinate prikazuju vrste slijeda tehnoloških radova i vrijeme trajanja istih. Podaci uneseni u gantogram dobiveni su na osnovu izračuna iz dokaznica mjera i analiza cijena. The final paper presents the entire process of construction organization. First of all, it was necessary to make a technical description of the building, and describe the technology of construction works. It is important to mention the equipment and materials used during the construction of the building. Based on the available project documentation, the proof of measures was calculated, and the unit price for each item of construction works was determined by price analysis. The cost list shows the total cost of works, while craft works and interior design are a separate project. The price of the works is HRK 2,377,885, which can be seen from the recapitulation of costs. It is envisaged that the implementation of works will be covered within 4 months, or 83 working days. More precisely, the works start on 01.09.2020, and the completion of the works is expected on 05.12.2020.The time display of the beginning and end of construction works is shown by a Gantt chart, ie a graph whose coordinates show the types of sequence of technological works and the duration of the same. The data entered in the Gantt chart were obtained on the basis of calculations from evidence of measures and price analysis.
Databáze: OpenAIRE