Popis: |
Namen te naloge je prilagoditi obstoječo metodo predračunavanja, da bo le-ta obnavljajoča. Za ta namen je bila izbrana analiza praga pokritja, ki je predstavljena v prvem delu naloge in v nadaljevanju postopoma spremenjena. Spremembe izhajajo iz zahtev predračuna, opisanih v prvem delu naloge. Prilagoditev izbrane metode je bila preverjena s teoretičnim primerom in nato uporabljena na primeru projekta, za katerega smo določili potek sprememb v proizvodnji. The purpose of this thesis is to adapt an existing precalculation method for it to be recurring. For this purpose, we have chosen the break-even method, which is presented in the first part of the thesis, and subsequently gradually changed. The changes originate from the precalculation requirements, described in the first part of the thesis. The adaptation of the selected method has been done with a theoretical example and then used on an example project for which we have determined the course of changes in production. |