Planning activities of building land in order to reduce optical losses in the process of building lean
Autor: | Azevedo, Vanessa da Silva de |
---|---|
Přispěvatelé: | Borges Júnior, Cyro Alves, Miyashita, Ricardo, Vellasco, Pedro Colmar Gonçalves da Silva, Guimarães, Giuseppe Barbosa, Cardoso, Vinícius Carvalho |
Jazyk: | portugalština |
Rok vydání: | 2010 |
Předmět: | |
Zdroj: | Biblioteca Digital de Teses e Dissertações da UERJ Universidade do Estado do Rio de Janeiro (UERJ) instacron:UERJ |
Popis: | Submitted by Boris Flegr (boris@uerj.br) on 2021-01-06T19:01:25Z No. of bitstreams: 15 Vanessa Azevedo PreTex.pdf: 215632 bytes, checksum: ec778a799fecaf63fdfcb6fc29263bee (MD5) Vanessa Azevedo Textual 1 Int f19.pdf: 87638 bytes, checksum: 1e48b2aff2bc9c6bd61628da2732c03a (MD5) Vanessa Azevedo Textual 2 Sec1 f22.pdf: 658124 bytes, checksum: f2f94f63ec3733eb24b0cef5a4c2009e (MD5) Vanessa Azevedo Textual 3 Sec2 f46.pdf: 828207 bytes, checksum: 0ea735a5fc6ddc7527434433051ce589 (MD5) Vanessa Azevedo Textual 4 Sec3 f74.pdf: 486734 bytes, checksum: 682dec322cebbf8c2ad437f01d391ae6 (MD5) Vanessa Azevedo Textual 5 Sec4 f115.pdf: 1916013 bytes, checksum: ec163a7465f08629cda1a2eece96d28a (MD5) Vanessa Azevedo Textual 6 Sec5 f169.pdf: 45821 bytes, checksum: e35838c10a4a1187639488b4842aa50c (MD5) Vanessa Azevedo Textual 7 Ref f173.pdf: 61684 bytes, checksum: 17f8fdc427fe29788a955287f613d804 (MD5) Vanessa Azevedo Textual 8 Anexo A f176.pdf: 122092 bytes, checksum: ff944fdc3594be6853e1203271207930 (MD5) Vanessa Azevedo Textual 9 Anexo B f177.pdf: 99584 bytes, checksum: 075f902faedb9173b847e846aa90a6ee (MD5) Vanessa Azevedo Textual 10 Anexo C f181.pdf: 354607 bytes, checksum: 84c8af5bc0c555f9894fc7abac3c1fa8 (MD5) Vanessa Azevedo Textual 11 Anexo C f182.pdf: 354511 bytes, checksum: a16cd984eb91b2c32108680759120c5f (MD5) Vanessa Azevedo Textual 12 Anexo C f183.pdf: 354405 bytes, checksum: 1dc01eb18ed23e8d5146360561b7d5bb (MD5) Vanessa Azevedo_Textual 13_Anexo C_p184.doc: 240640 bytes, checksum: 83289c436f28dbf14a58afbd99a589ee (MD5) Vanessa Azevedo Textual 14 Anexo C f185.pdf: 354176 bytes, checksum: 960c1baa48d766c3a45ae7713bebfe55 (MD5) Made available in DSpace on 2021-01-06T19:01:25Z (GMT). No. of bitstreams: 15 Vanessa Azevedo PreTex.pdf: 215632 bytes, checksum: ec778a799fecaf63fdfcb6fc29263bee (MD5) Vanessa Azevedo Textual 1 Int f19.pdf: 87638 bytes, checksum: 1e48b2aff2bc9c6bd61628da2732c03a (MD5) Vanessa Azevedo Textual 2 Sec1 f22.pdf: 658124 bytes, checksum: f2f94f63ec3733eb24b0cef5a4c2009e (MD5) Vanessa Azevedo Textual 3 Sec2 f46.pdf: 828207 bytes, checksum: 0ea735a5fc6ddc7527434433051ce589 (MD5) Vanessa Azevedo Textual 4 Sec3 f74.pdf: 486734 bytes, checksum: 682dec322cebbf8c2ad437f01d391ae6 (MD5) Vanessa Azevedo Textual 5 Sec4 f115.pdf: 1916013 bytes, checksum: ec163a7465f08629cda1a2eece96d28a (MD5) Vanessa Azevedo Textual 6 Sec5 f169.pdf: 45821 bytes, checksum: e35838c10a4a1187639488b4842aa50c (MD5) Vanessa Azevedo Textual 7 Ref f173.pdf: 61684 bytes, checksum: 17f8fdc427fe29788a955287f613d804 (MD5) Vanessa Azevedo Textual 8 Anexo A f176.pdf: 122092 bytes, checksum: ff944fdc3594be6853e1203271207930 (MD5) Vanessa Azevedo Textual 9 Anexo B f177.pdf: 99584 bytes, checksum: 075f902faedb9173b847e846aa90a6ee (MD5) Vanessa Azevedo Textual 10 Anexo C f181.pdf: 354607 bytes, checksum: 84c8af5bc0c555f9894fc7abac3c1fa8 (MD5) Vanessa Azevedo Textual 11 Anexo C f182.pdf: 354511 bytes, checksum: a16cd984eb91b2c32108680759120c5f (MD5) Vanessa Azevedo Textual 12 Anexo C f183.pdf: 354405 bytes, checksum: 1dc01eb18ed23e8d5146360561b7d5bb (MD5) Vanessa Azevedo_Textual 13_Anexo C_p184.doc: 240640 bytes, checksum: 83289c436f28dbf14a58afbd99a589ee (MD5) Vanessa Azevedo Textual 14 Anexo C f185.pdf: 354176 bytes, checksum: 960c1baa48d766c3a45ae7713bebfe55 (MD5) Previous issue date: 2010-06-30 Fundação de Amparo à Pesquisa do Estado do Rio de Janeiro Adapted from the concepts of lean production, lean construction is a management philosophy of the production directed to construction. Of the five lean principles what else has been studied since the publication of Technical Report No. 72 - Application of New Production Philosophy to Construction (published by CIFE - Center for Integrated Facility Engineering, connected to Stanford University, USA) is the continuous flow. The idea of maintaining the continuous flow is directly linked to continued productivity, ie keep productivity at a constant rate. Apply the concept of lean stream by maintaining productivity rates means managing the project so that the execution of activities is maintained in accordance with the guidelines established during the planning phase. Through lean management tools is done in Excel simulation of three activities from the implementation process of building slabs of buildings constructed in steel structures, steel deck, frame and concrete. The elaboration of the sheet allows the evaluation of the losses occurred during the execution of activities from the perspective of the concept of delays and waits. The total of these losses still result in two distinct effects considered to accumulated losses and offset losses, providing the manager of the project consistent data to plot strategy for disposal of waste or a preview of wastes that may be associated with the implementation of the activities if they are badly planned. Adaptada dos conceitos da produção enxuta, a construção enxuta é uma filosofia de gestão da produção voltada à construção civil. Dos cinco princípios enxutos em que se baseia, o que mais tem se estudado desde a publicação do Relatório Técnico n°72 Aplicação da Nova Filosofia de Produção à Construção (publicado pelo CIFE Center for Integrated Facility Engineering, ligado à Universidade de Stanford, EUA) é o Fluxo Contínuo. A idéia de manter o fluxo contínuo está diretamente ligada à continuidade da produtividade, ou seja, manter a produtividade em uma taxa constante. Aplicar o conceito enxuto de fluxo contínuo através da manutenção das taxas de produtividade significa gerenciar o empreendimento de modo que a execução das atividades se mantenha de acordo com os parâmetros estabelecidos durante a fase de planejamento. Por meio de ferramentas enxutas de gerenciamento é feita a simulação em Excel de três atividades pertencentes ao processo de execução de lajes prediais de edifícios construídos em estruturas metálicas: steel deck, armação e concretagem. A elaboração da planilha possibilita a avaliação das perdas ocorridas durante a execução das atividades sob a ótica do conceito de atrasos e esperas. A soma destas perdas resulta ainda em dois efeitos distintos considerados como perdas acumuladas e perdas compensadas, proporcionando ao gerente do empreendimento dados consistentes para traçar estratégicas para eliminação do desperdício ou uma antevisão dos desperdícios que podem estar associados à execução das atividades se estas forem mal planejadas. |
Databáze: | OpenAIRE |
Externí odkaz: |