Life-of-mine ventilation and refrigeration planning for Resolution Copper Mine

Autor: Bluhm, S, Moreby, R, von Glehn, F, Pascoe, C
Jazyk: angličtina
Rok vydání: 2014
Předmět:
Zdroj: Journal of the Southern African Institute of Mining and Metallurgy, Volume: 114, Issue: 6, Pages: 497-503, Published: JUN 2014
Popis: Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate is 120 kt/day. The project is in prefeasibility evaluation. This paper discusses features of the ventilation system design, which include multiple ventilation shafts with total flow of about 3000 m³/s and both surface and underground refrigeration systems with more than 140 MW total capacity. This will be a very challenging mine to ventilate, but this work has demonstrated that it will be technically achievable with the application of existing technology.
Databáze: OpenAIRE