Connection of EU-XFEL Cryomodules, Caps and Boxes in the EU-XFEL Main LINAC And Injector: Welding of Cryo-Pipes and Assembly of Beamline Absorbers under the Requirements of the PED Regulation

Autor: Barbanotti, Serena, Hintz, Heiko, Pierini, Paolo, Jensch, Kay, Maschmann, Wolfgang, Buhr, Christian, Lilje, Lutz, Wagner, Antonio de Zubiaurre
Jazyk: angličtina
Rok vydání: 2015
Zdroj: 17th International Conference on RF Superconductivity, SRF2015, Whistler, Canada, 2015-09-13-2015-09-18
Popis: The European X-ray Free Electron Laser (EU-XFEL) [1] cold linac [2] consists of 100 assembled cryomodules, 6 feed/end boxes and 6 string connection boxes fixed to the ceiling of the accelerator tunnel; the injector consists of a radio frequency gun, one 1.3 GHz and one 3.9 GHz cryomodule, one feed and one end cap lying on ground supports. The components are connected together in the tunnel, after cold testing, transport, final positioning and alignment. The cold linac is a pressure equipment and is therefore subjected to the requirements of the Pressure Equipment Directive (PED). This paper describes the welding and subsequent Non-Destructive Testing (NDT) of the cryo-pipes (with a deeper look at the technical solutions adopted to satisfy the PED requirements), the assembly of the beam line absorbers and the final steps before closing the connection with a DN1000 bellows. A special paragraph will be dedicated to the connection of the injector components, where the lack of space makes this installation a particularly challenging task.
Databáze: OpenAIRE