ICARUS T600 (CNGS2) Status Report

Autor: Ankowski, A, Antonello, M, Aprili, P, Arneodo, F, Baibussinov, B, Baldo-Ceolin, M, Battistoni, G, Barze, L, Benetti, P, Borio, A, Calligarich, E, Cambiaghi, M, Carbonara, F, Cavanna, F, Centro, S, Cesana, A, Cieslik, K, Cocco, A G, Dabrowska, A, Dolfini, R, Farnese, C, Fava, A, Ferrari, A, Fiorillo, G, Galli, S, Gibin, D, Gigli-Berzolari, A, Giuliano, A, Graczyk, K, Gninenko, S, Guglielmi, A, Juszczak, C, Holeczek, J, Kielczewska, D, Kirsanov, M, Kisiel, J, Kozlovskii, T, Krasnikov, N, Lantz, M, Mannocchi, G, Markiewicz, M, Matveev, V, Mauri, F, Menegolli, A, Meng, G, Montanari, C, Muraro, S, Nowak, J, Palamara, O, Periale, L, Piano Mortari, G, Piazzoli, A, Picchi, P, Pietropaolo, F, Polchlopek, W, Posiadala, M, Przewlocki, P, Rappoldi, A, Raselli, G L, Rondio, E, Rossella, M, Rubbia, C, Sala, P, Satta, L, Scannicchio, D, Segreto, E, Sergiampietri, F, Sobczyk, J, Stefan, D, Stepaniak, J, Sulej, R, Szarska, M, Terrani, M, Trinchero, G, Varanini, F, Ventura, S, Vignoli, C, Wachala, T, Zalewska-Bak, A, Zaremba, K
Rok vydání: 2009
Předmět:
Popis: Since the last presentation to the SPSC committee, the ICARUS T600 detector assembly has progressed up to its completion. The cryogenic plant, the liquefier system, the read-out, the Laboratory infrastructure and the safety facilities have been installed. However the Collaboration had to face some problems that have delayed the start-up of the commissioning of the apparatus. Besides the one-month suspension of the activities in the Laboratory, following the seismic event in the l’Aquila region, delays have emerged due to the commissioning of the liquefier system, to the pressure/vacuum leaking of some wire signal feed-through flanges and to the deformation of a panel of the external thermal insulation.
Databáze: OpenAIRE