Popis: |
The Yangtze River Basin experiences frequent extreme heatwaves and prolonged droughts, resulting in a tight supply demand balance of electricity and negatively impacting socioeconomic production. Meanwhile, ongoing inter-basin water diversion projects are planned that will divert approximately 25.263 billion cubic meters of water from the Yangtze River Basin annually, which may further affect the power supply in the region. In this study, the CLHMS-LSTM model, a land-surface hydrological model coupled with a long short-term memory (LSTM)-based reservoir operation simulation model, is used to investigate the impact of water diversions on the power generation of the Yangtze River mainstream reservoirs under extreme drought conditions. Two different water diversion schemes are adopted in this study, namely the minimum water deficit scheme (Scheme 1) and minimum construction cost scheme (Scheme 2). The results show that the land surface–hydrological model was able to well characterize the hydrological characteristics of the Yangtze River mainstem, with a daily scale determination coefficient greater than 0.85. The LSTM reservoir operation simulation model was able to simulate the reservoir releases well, with the determination coefficient greater than 0.93. The operation of the water diversion projects will result in a reduction in the power generation of the Yangtze River mainstem by 14.97 billion kilowatt-hours. As compared to the minimum construction cost scheme (Scheme 2), the minimum water deficit scheme (Scheme 1) reduces the loss of power generation by 1.38 billion kilowatt-hours. The research results provide new ideas for the decision-making process for the inter-basin water diversion project and the formulation of water diversion plans, which has implications for ensuring the security of the power supply in the water diversion area. |