Risk management in construction projects by coupling the SMACC agent with the MADS MOSAR method – application to the dam project in Mascara, Algeria
Autor: | Mohamed Achoui, Mohamed Amine Allal, Franck Taillandier, Fethi Hamzaoui |
---|---|
Přispěvatelé: | Université de Tlemcen, Risques, Ecosystèmes, Vulnérabilité, Environnement, Résilience (RECOVER), Aix Marseille Université (AMU)-Institut National de Recherche pour l’Agriculture, l’Alimentation et l’Environnement (INRAE), Faculté de technologie, Département de Génie Civil, Université Abou Bekr Belkaid Tlemcen |
Jazyk: | angličtina |
Rok vydání: | 2019 |
Předmět: |
0209 industrial biotechnology
Computer science business.industry Strategy and Management 0211 other engineering and technologies 02 engineering and technology Building and Construction MADS MOSAR Industrial engineering Construction projects risk management [SPI]Engineering Sciences [physics] 020901 industrial engineering & automation Coupling (computer programming) Management of Technology and Innovation 021105 building & construction Stochastic simulation ZABR business SMACC Risk management ComputingMilieux_MISCELLANEOUS |
Zdroj: | International Journal of Construction Management International Journal of Construction Management, 2019, pp.1-15. ⟨10.1080/15623599.2019.1641890⟩ |
ISSN: | 1562-3599 2331-2327 |
DOI: | 10.1080/15623599.2019.1641890⟩ |
Popis: | International audience; Construction projects are subject to numerous risks and their management is an important issue. To meet this challenge, we developed Stochastic Simulation for Multi-Agent Construction Project (SMACC), a construction project simulation tool considering project risks and based on an agent-based approach. But, the simulation of a construction project by SMACC requires specific information about the project and the risks that may affect it. Yet, our previous work was not interested in the instantiation process of the model from a real project. This article presents an approach being placed upstream of SMACC for instantiating the agents of the model and evaluating them with a focus on risks. This approach is based on the combination of project management approaches and MADS MOSAR (Organized Method of Systemic Risk Analysis). It is applied to a real case: the construction of a dam vault in Oued Taht in Mascara in Algeria. |
Databáze: | OpenAIRE |
Externí odkaz: |