Factorial design study of total petroleum contaminated soil treatment using land farming technique
Autor: | Ehizonomhen Solomon Okonofua, E. Atikpo, Kayode Hassan Lasisi |
---|---|
Rok vydání: | 2021 |
Předmět: |
Optimization
Environmental Engineering Land farming 010504 meteorology & atmospheric sciences Soil test Environmental remediation Remediation 010501 environmental sciences engineering.material 01 natural sciences lcsh:TD1-1066 chemistry.chemical_compound Soil contamination Factorial design lcsh:Environmental technology. Sanitary engineering Waste Management and Disposal Water content 0105 earth and related environmental sciences Water Science and Technology Renewable Energy Sustainability and the Environment Environmental engineering Factorial experiment Pollution chemistry engineering Environmental science Total petroleum hydrocarbon Fertilizer Cow dung |
Zdroj: | Sustainable Environment Research, Vol 31, Iss 1, Pp 1-13 (2021) |
Popis: | Land farming technique was used to treat hydrocarbon contaminated soil collected from a crude oil spill sites in Edo State, Nigeria. Calibrated standard auger was used to collect soil samples from the site at depth below 30 cm. The samples were characterized and classified. Cow dung and NPK fertilizer were added as additives to complement the nutriments of the soil samples before total petroleum hydrocarbon quantification and remediation procedures. Factorial design was applied to vary the input parameters such as pH, mass of substrate, moisture content and turning times of land farming so to ascertain the optimal conditions for the procedure. The result revealed that the in-situ total petroleum hydrocarbon (TPH) value was 5,000 mg kg-1 on the average and after 90 days of treatment, TPH reduced to 645.907 mg kg-1. The turning rate, pH, moisture content and mass of substrate had 82.79%, 4.36%, 0.48% and 0.046% contributions respectively to the degradation process using land farming treatment. Numerical optimization techniques applied in the optimum point for land farming input parameters to achieve predicted maximum removal of 98.60% were evaluated as pH, mass of substrate, moisture content and turning rate to be 6.01, 1 kg, 10% and 5 times in a week respectively. TPH removed at this optimum point was 97.83% reducing from 5,000 to 635.907 mg kg-1. The high coefficient of determination (r2 = 0.9865) as observed in the closeness of predicted and experimental values reflects the reliability of the model and hence, land farming practice with close attention on turning rate as revealed by this study, is recommended for TPH contaminated soil remediation. |
Databáze: | OpenAIRE |
Externí odkaz: |