Euclid mission status

Autor: Marc Sauvage, J. Hoar, Stefanie Wachter, A. Short, L. Gaspar Venancio, Warren Holmes, G. Saavedra Criado, Mark Cropper, Yannick Mellier, P. Musi, Knud Jahnke, Ulf E. Israelsson, Luca Stagnaro, R. Kohley, V. Cazaubiel, Michael Seiffert, Anne Ealet, Guillermo Buenadicha, Giuseppe D. Racca, J. Amiaux, Michel Berthé, R. Vavrek, Cyril Colombo, S. Pottinger, S. Niemi, P. Strada, Jean-Christophe Salvignol, R. J. Laureijs, Alberto Anselmi, Thierry Maciaszek, J. Lorenzo Alvarez, Fabio Pasian
Přispěvatelé: Institut d'Astrophysique de Paris (IAP), Institut national des sciences de l'Univers (INSU - CNRS)-Sorbonne Université (SU)-Centre National de la Recherche Scientifique (CNRS), Laboratoire d'Astrophysique de Marseille (LAM), Aix Marseille Université (AMU)-Institut national des sciences de l'Univers (INSU - CNRS)-Centre National d'Études Spatiales [Toulouse] (CNES)-Centre National de la Recherche Scientifique (CNRS), Observatoire Astronomique de Marseille Provence (OAMP), Université de Provence - Aix-Marseille 1-Institut national des sciences de l'Univers (INSU - CNRS)-Centre National de la Recherche Scientifique (CNRS)
Jazyk: angličtina
Rok vydání: 2022
Předmět:
Zdroj: Proceedings of the SPIE
Proceedings of the SPIE, 0000, à renseigner, Unknown Region. ⟨10.1117/12.2054883⟩
DOI: 10.1117/12.2054883⟩
Popis: International audience; In June 2012, Euclid, ESA's Cosmology mission was approved for implementation. Afterwards the industrial contracts were signed for the payload module and the spacecraft prime, and the mission requirements consolidated. We present the status of the mission in the light of the design solutions adopted by the contractors. The performances of the spacecraft in its operation, the telescope assembly, the scientific instruments as well as the data-processing have been carefully budgeted to meet the demanding scientific requirements. We give an overview of the system and where necessary the key items for the interfaces between the subsystems.
Databáze: OpenAIRE