Optimization of the Structure and Execution Modes of Intersecting Operation Sets

Autor: Genrikh Levin, Alexandre Dolgui, Boris Rozin
Přispěvatelé: Operational Research Laboratory, United Institute of Informatics Problems, National Academy of Sciences, Institut de Recherche en Communications et en Cybernétique de Nantes (IRCCyN), Mines Nantes (Mines Nantes)-École Centrale de Nantes (ECN)-Ecole Polytechnique de l'Université de Nantes (EPUN), Université de Nantes (UN)-Université de Nantes (UN)-PRES Université Nantes Angers Le Mans (UNAM)-Centre National de la Recherche Scientifique (CNRS), Mines Nantes (Mines Nantes)
Jazyk: angličtina
Rok vydání: 2016
Předmět:
Zdroj: IFAC-Papers
8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016
8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016, Jun 2016, Troyes, France. pp.105-110
Popis: A collection of intersecting packages of operations is executed successively and all operations of each current package are executed in parallel. The intensities of execution of operations to be defined remain invariable for all packages that include these operations. A family of nonintersecting non-unit subsets of the initial set of operations is given. Each of these subsets is considered as a potential block of operations. All operations of such block can be executed with common intensity (in aggregated manner) or completely disaggregated (each operation with its own intensity). Cost and time expenses for execution of operations depend on their volumes and intensities. Additional expenses for execution of operation package are proportional to the duration of this package. The proportionality factor is a sum of coefficient related to aggregate implementation of all blocks in the package and additional coefficients for each such disaggregate block. On the other hand disaggregation allows to reduce the expenses for operations execution by selecting optimal intensities of its operations. The problem is to determine an option to aggregate the operations of the potential blocks or not and to define the intensities of all operations minimizing the total cost under constraint on the total collection duration. The methods for two special cases of the problem are proposed.