The Phase-2 Upgrade of the CMS Data Acquisition

Autor: Petr Zejdl, Dominique Gigi, Wei Li, Marc Dobson, Uthayanath Suthakar, Christoph Paus, Ulf Behrens, James G Branson, Nekija Dzemaili, Maciej Gladki, Gilbert Badaro, Thomas James, Sergio Cittolin, Andre Stahl, Panagiotis Soursos, Christian Deldicque, Diego Da Silva-Gomes, Andrea Bocci, Andrea Petrucci, Kolyo Raychinov, Georgiana-Lavinia Darlea, Marco Pieri, Christoph Schwick, Jeroen Hegeman, Ioannis Papakrivopoulos, Guillelmo Gomez-Ceballos, Ema Puljak, Dainius Simelevicius, Frank Glege, Luciano Orsini, Dinyar Rabady, Attila Racz, Frans Meijers, Remigius K. Mommsen, Emilio Meschi, Philipp Brummer, Srecko Morovic, Cristina Vazquez-Velez, Hannes Sakulin
Jazyk: angličtina
Rok vydání: 2021
Předmět:
Zdroj: EPJ Web of Conferences, Vol 251, p 04023 (2021)
Popis: The High Luminosity LHC (HL-LHC) will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of $7.5\times10^{34}$ cm$^{-2}$ s$^{-1}$, at the price of extreme pileup of up to 200 interactions percrossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector.The upgraded CMS detector will be read out by approximately 50 thousand high-speed front-end optical links at an unprecedented data rate of up to 80~Tb/s,for an average expected total event size of approximately 7-10 MB.Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1),consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis.The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level-1 accepts into events, and distribute them to the HLT processors where they will be further selected. Events accepted by the HLT will be stored permanently at a rate of up to 7.5~kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 operation of CMS. The High Luminosity LHC (HL-LHC) will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of 7:5 × 10$^{34}$ cm$^{−2}$ s$^{−1}$, at the price of extreme pileup of up to 200 interactions per crossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector. The upgraded CMS detector will be read out by approximately fifty thousand highspeed front-end optical links at an unprecedented data rate of up to 80 Tb/s, for an average expected total event size of approximately 8 − 10 MB. Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1), consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis. The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level- 1 accepts into events, and distribute them to the HLT processors where they will be filtered further. Events accepted by the HLT will be stored permanently at a rate of up to 7.5 kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 of CMS.
Databáze: OpenAIRE