Comparison between centralized and decentralized storage energy management for Direct Wave Energy Converter Farm
Autor: | Bernard Multon, Thibaut Kovaltchouk, Judicael Aubry, Hamid Ben Ahmed, Anne Blavette |
---|---|
Přispěvatelé: | Systèmes et Applications des Technologies de l'Information et de l'Energie (SATIE), École normale supérieure - Cachan (ENS Cachan)-Université Paris-Sud - Paris 11 (UP11)-Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)-École normale supérieure - Rennes (ENS Rennes)-Université de Cergy Pontoise (UCP), Université Paris-Seine-Université Paris-Seine-Conservatoire National des Arts et Métiers [CNAM] (CNAM)-Centre National de la Recherche Scientifique (CNRS), Laboratoires des systèmes embarqués - ESTACA (ESTACA), École Supérieure des Techniques Aéronautiques et de Construction Automobile (ESTACA), ANR-11-PRGE-0013,QUALIPHE,Qualité, Lissage et Intégration au réseau de la Production des Houlogénérateurs électriques directs(2011), University College Cork (UCC), Pôle Systèmes et Energie Embarqués pour les Transports, Centre de Recherche et d'Ingénierie de l'ESTACA (CERIE), École Supérieure des Techniques Aéronautiques et de Construction Automobile (ESTACA)-École Supérieure des Techniques Aéronautiques et de Construction Automobile (ESTACA) |
Rok vydání: | 2015 |
Předmět: |
Aging
Mathematical optimization Engineering Energy management 020209 energy Design optimization Control (management) Energy Engineering and Power Technology 02 engineering and technology Life Cycle Cost 7. Clean energy Energy storage Power Quality Supercapacitors 0202 electrical engineering electronic engineering information engineering Electronic engineering Production (economics) Electrical and Electronic Engineering ComputingMilieux_MISCELLANEOUS Simulation Direct Wave Energy Converter Power Smoothing Electrical Energy Storage System business.industry Flicker [SPI.NRJ]Engineering Sciences [physics]/Electric power 020208 electrical & electronic engineering Grid Sizing Reliability engineering Power (physics) Constraint (information theory) Grid Integration Distributed generation Life Estimation business |
Zdroj: | Ecological Vehicles and Renewable Energies (EVER), 2015 Tenth International Conference on Ecological Vehicles and Renewable Energies (EVER), 2015 Tenth International Conference on, Mar 2015, Monte-Carlo, Monaco. ⟨10.1109/EVER.2015.7112985⟩ IEEE Transactions on Energy Conversion IEEE Transactions on Energy Conversion, Institute of Electrical and Electronics Engineers, 2016, 31 (3), pp.1051-1058. ⟨10.1109/TEC.2016.2547462⟩ |
ISSN: | 0885-8969 1558-0059 |
DOI: | 10.1109/ever.2015.7112985 |
Popis: | This paper compares the sizing of distributed energy storage systems (ESS) with two control types in order to smooth a direct wave energy converter farm production, namely a centralized one that deals with the point of common coupling (PCC) power with aggregated information and a decentralized one that deals with each unit with only local information. The main objective is to compare the two controls on the basis of their life cycle cost. The ESS is necessary for grid integration in the case considered here due to the flicker constraint. The co-optimization strategies for both the sizing and the management of an ESS are based on a rule-based energy management and a sequential approach to deal with the power quality constraint. This management strategy has been optimized for each size in order to reduce aging speed while respecting the flicker criterion. The final design is expected to minimize total system cost. The centralized control clearly allowed smaller capacity. However, it may lead to an increase in cables losses compared with the decentralized case, although it is expected to be negligible under the conditions considered in this paper. The confirmation of this hypothesis will be the objective of future work. |
Databáze: | OpenAIRE |
Externí odkaz: |